Customization: | Available |
---|---|
Application: | Electronic, Instrument, Position Sensor, Lighting |
Type: | Current Transformer |
Still deciding? Get samples of US$ 56.2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
product name:0.1 1.0 Accuracy Clamp on CT Current Transformer for Electric Monitoring Devices
Our main product are miniature voltage transformer ,miniature current transformer ,instrument current transformer , clamp on ccurrent transformer ,split core current transformer ,three phase current transformer ,zero-flux current transformer
1.Product pictures
Low cost |
5 standard sizes |
Clamp-on core design,safer,easier installation, portable |
Both Silicon Steel & Nickel Alloy cores available |
Silicon Steel cores provide moderate accuracy and lower cost for appropriate current measurement |
Nickel Alloy cores are suitable for applications that require the highest accuracy with minimal phase angle error. Applications would include electric power quality monitoring devices |
Rated Primary current | 1-200A |
Turn ratio | 1:1000 1:2000 1:2500 |
Output | 0.333V 1.5V |
Accuracy | 0.1, 0.2 ,1.0 Class |
Second burden(Ohms) | <=5, <=50 ,>=100k |
Dielectric Resistance | 1000MOhms @ 500 Vdc |
Case Material | Polypropylene resinUL flame retardant rating 94-V0 |
Voltage rank | 600Vac(isolated condition), 30Vac(bareness condition) |
High Potential | 2500Volts/min |
Frequency Range: | 50/60Hz |
Operating Temperature | -25ºC to +70ºC |
Standard | IEC 60044-1 |
Accessories | Supplied with feet for base mounting if required |
Certification | RoHS compliant CE&ETL approved |
Part Number | Rated Input (A) |
Turn Ratio |
Frequency ( Hz ) |
Secondary Burden Resistance (Ohms) |
Accuracy Class |
Outline Dimensions (mm) |
GWCTC0080N | 1~50 | 1:1000 1:2000 1:2500 ... |
50 to 400 | ≤50 | 0.1 0.2 |
ID-L-W-H 8.0-46.0-27.0-171 |
GWCTC0130N | 5~200 | 50 to 400 | ≤5 | 0.1 0.2 |
ID-L-W-H 13.0-52.0-27.0-174 |
|
GWCTC0200N | 5~200 | 50 to 400 | ≤5 | 0.1 0.2 |
ID-L-W-H 20.0-52.0-27.0-180 |
|
GWLCTC-0250 | Input:100A Output:0.333, 1.5V |
-- | 50 to 1K | ≥100k | 1.0 | ID-L-W-H 25.0-50.0-19.5-87 |
3.Terms of Shipment:
Within 10 working days after received related prepayment or L/C.
4.Payment terms:
(1)T/T 100% or 50% deposit by T/T in advance, balance amount to be paid 7 days before
delivery.
(2) By irrevocable L/C at sight, to be issued immediately against confirmed order.
(3)Payment by T/T, if order amount is less than USD 20,000.
5.Production
The following picture showed you about all finished transformer production line and package with export standard carton and strong pallets:
6.Warranty:
(1)We provide 1 year warranty.
(2)If the product is defective, please notify us within 3 days of delivery.
(3)All products must be returned on their original condition, in order to qualify for a refund or exchange of goods
7.Why choose us?
Quality and honest first!
A. Flexible service for diffierent transformers with high efficiency performance.
B. Over 40 years experience of transformer designing and producing.
C.100% test of every single product we produce from incoming material checking.
D. UL, CE, ISO9001:2008
E. We offer custom-made transformers, OEM and ODM are welcome
F. We deliver the quality you expect at consistently competitive prices
G.Transformer quality lifetime:10 Years.
H.Specialty Sales service:5 -10 Years
8.Flow chart of trading activities:
NO |
Step |
Days need |
1 |
Request for quotation |
1 day |
2 |
Making quotations |
1 day |
3 |
Offer and counter offer |
3 days |
4 |
Sending and receiving samples |
3-10 days |
5 |
Sample confirmation |
3 days |
6 |
Placing a firm order |
1 day |
7 |
Paying and receiving the down payment |
1-4 day |
8 |
Factory production & Quality inspection |
15-20 days |
9 |
Paying and receiving the balance |
4 days |
10 |
Delivery of goods |
1 days |
9.contact