Customization: | Available |
---|---|
Connectors: | USB |
Test Mode: | Instant Test |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Name:GREWIN Tdr Icm MIM 100km cable Fault Test Equipment for Prelocating System
1. POWER CABLE FAULT PRE-LOCATOR ADVANTAGES:
Application: power cable main insulation fault pre-locating
FEATHER:work mode: TDR,ICM,MIM
HMI: Ultra-high brightness and high resolution color LCD which clearly under the suhshine. Support both touch screen and button operation.
Device supports built-in storage and PC download and monitoring
Specification:
Sampling frequencies:200MHz
Resolution :0.4m
Testing range: 100km
Blood zone:2m
Signal gain: 70dB
Low voltage impulse voltage:32V
power supply: 18650 li-ion batteries x2
Vol.: 280×220×90mm
weight:2.3kg
2.Grewin 0-32kv 1000j DC HV Generator cable tester Testing Equipment for Cable Fault Location
APPLICATION:inject the impulse high voltage into the faulty cable to repeat the fault for pre-locating and pinpointing
FEATHER:
Portable:high class high protective portable case with pull rod and wheel
integrated design with built-in capacitor, HV zero position start,no HV leakage and auto discharging after power off.
Discharging mode: manual, period and DC optional
integrated packsack cable and accessories storage easy to use
SPECIFICATION:
HVSG-500GN -A30-4:0-32Kv
Energy-storage capacitor 4uf, Max. power energy 2000J
HVSG-500GN -A30-2:0-32Kv
Energy-storage capacitor 2uf, Max. power energy 1000J
HVSG-500GN -A10:0-10Kv
Energy-storage capacitor 10uf, Max. power energy 500J
Volume :500mm×280mm×450mm
Weight :26kgs
3.Terms of Shipment:
Within 10 working days after received related prepayment or L/C.
4.Payment terms:
(1)T/T 100% or 50% deposit by T/T in advance, balance amount to be paid 7 days before
delivery.
(2) By irrevocable L/C at sight, to be issued immediately against confirmed order.
(3)Payment by T/T, if order amount is less than USD 20,000.
5.Warranty:
(1)We provide 1 year warranty.
(2)If the product is defective, please notify us within 3 days of delivery.
(3)All products must be returned on their original condition, in order to qualify for a refund or exchange of goods
6.Why choose us?
Quality and honest first!
A. Flexible service for diffierent transformers with high efficiency performance.
B. Over 40 years experience of transformer designing and producing.
C.100% test of every single product we produce from incoming material checking.
D. UL, CE, ISO9001:2008
E. We offer custom-made transformers, OEM and ODM are welcome
F. We deliver the quality you expect at consistently competitive prices
G.Transformer quality lifetime:10 Years.
H.Specialty Sales service:5 -10 Years
7.Flow chart of trading activities:
NO |
Step |
Days need |
1 |
Request for quotation |
1 day |
2 |
Making quotations |
1 day |
3 |
Offer and counter offer |
3 days |
4 |
Sending and receiving samples |
3-10 days |
5 |
Sample confirmation |
3 days |
6 |
Placing a firm order |
1 day |
7 |
Paying and receiving the down payment |
1-4 day |
8 |
Factory production & Quality inspection |
15-20 days |
9 |
Paying and receiving the balance |
4 days |
10 |
Delivery of goods |
1 days |
8.CONTACT:
Alice.Lee
Tianjin Grewin Technology Co.,Ltd.
Web:transformer.en.made-in-china.com