Customization: | Available |
---|---|
Connectors: | USB |
Test Mode: | Instant Test |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
It is mainly used for underground power cable (especially the single core high voltage cable) metal sheath grounding fault accurately pinpointing, also can be used in the auxiliary pinpointing of core grounding fault (in the case of sheath have been destroyed).
FLC-908D needs to be used in cooperation with FLD-902D EHV cable sheath fault locator to complete the precise grounding fault pinpointing of EHV cable sheath.
SPECIFICATION:
MODE | ACCESSORY | ACCURACY | MAX. SENSITIVITY | MAX.INPUT RANGE | DISPLAY |
STEP- VOLTAGE |
Step voltage probe | 1%(±0.1mV) | 0.1mV | ±300V | Signal waveform, fault point direction |
FAULT CURRENT PINPOINTNG | Current sensor | 1%(±1mA) | 1mA | ±1A | Signal waveform, fault current value |
HV PROBE ROD PINPOINTING | Step voltage rod | <1%(10V-10kV) | 1V(10-1kV) 10V(1kV-10kV) |
±10kV | DC voltage |
Other | |||||
Built-in | 18650 Lithium battery,standard 3.7V,6.8Ah. | ||||
Work status | Temperature :-10ºC-40ºC;Humidity 10-90%RH;Elevation <4500m | ||||
Weight and volume | Volume:220mm×125mm×55mm;Weight:0.9kg |
Receiver appearance
operation buttons
step-voltage probes
current sensor
HV rod
Company introduction
3.Terms of Shipment:
Within 10 working days after received related prepayment or L/C.
4.Payment terms:
(1)T/T 100% or 50% deposit by T/T in advance, balance amount to be paid 7 days before
delivery.
(2) By irrevocable L/C at sight, to be issued immediately against confirmed order.
(3)Payment by T/T, if order amount is less than USD 20,000.
5.Warranty:
(1)We provide 1 year warranty.
(2)If the product is defective, please notify us within 3 days of delivery.
(3)All products must be returned on their original condition, in order to qualify for a refund or exchange of goods
6.Why choose us?
Quality and honest first!
A. Flexible service for diffierent transformers with high efficiency performance.
B. Over 40 years experience of transformer designing and producing.
C.100% test of every single product we produce from incoming material checking.
D. UL, CE, ISO9001:2008
E. We offer custom-made transformers, OEM and ODM are welcome
F. We deliver the quality you expect at consistently competitive prices
G.Transformer quality lifetime:10 Years.
H.Specialty Sales service:5 -10 Years
7.Flow chart of trading activities:
NO |
Step |
Days need |
1 |
Request for quotation |
1 day |
2 |
Making quotations |
1 day |
3 |
Offer and counter offer |
3 days |
4 |
Sending and receiving samples |
3-10 days |
5 |
Sample confirmation |
3 days |
6 |
Placing a firm order |
1 day |
7 |
Paying and receiving the down payment |
1-4 day |
8 |
Factory production & Quality inspection |
15-20 days |
9 |
Paying and receiving the balance |
4 days |
10 |
Delivery of goods |
1 days |
8.Contact:
Grewin.Beyond
Tianjin Grewin Technology Co.,Ltd.
Web:transformer.en.made-in-china.com